FREE RESOURCES

Labour Factor Database

Our comprehensive database makes it simple to search for and find the exact labour factors you need. The advanced filtering options let you narrow down your search based on your project needs, helping you plan and schedule your construction projects more effectively.
  • Search

  • Trade Categories

For a feasibility study, your Carpentry breakdown is 45% labour, 55% materials and 0% fixed costs.

Description
Man Hours
Unit

Plywood Cladding - Interior




7-12mm thick


0.50
hrs/m2

15-21mm thick


0.55
hrs/m2

Plasterboard Wall linings




10mm Gib® standard plasterboard (fix only)


0.20
hrs/m2

Ceiling linings




10mm Gib® standard plasterboard (fix only)


0.22
hrs/m2

Interior Linings (hand)




Wall Linings




9.5mm Gibraltar Board


0.10
hrs/m2

4.75mm, 6mm Hardboard


0.25
hrs/m2

3mm, 4.75mm Pegboard


0.30
hrs/m2

12mm Pinex Softboard


0.10
hrs/m2

4.5mm Asbestos Cement


0.30
hrs/m2

4mm Plastic Covered Wallboard


1.10
hrs/m2

4mm, 6mm Plywood


0.50
hrs/m2

12mm Pinex panels


0.30
hrs/m2

12mm Pinex Accoustic Tiles


0.45
hrs/m2

Extra Values on Linings




  • Screw fixing

  • 0.45
    hrs/m2
  • Glue fixing

  • 0.25
    hrs/m2
  • Battens

  • 0.10
    hrs/m2
  • Jointing mould

  • 0.15
    hrs/m2

    Wall Strappings




    50 x 25mm at 300mm centres


    0.25
    hrs/m2

    50 x 25mm at 300mm centres


    6.50
    hrs/100 lineal metres

    75 x 25mm at 300mm


    0.25
    hrs/m2

    75 x 25mm at 300mm


    6.50
    hrs/100 lineral metres

    50 x 25mm at 600mm centres


    0.30
    hrs/m2

    50 x 25mm at 600mm centres


    8.00
    hrs/100 lineral metres

    75 x 25mm at 600mm centres


    0.30
    hrs/m2

    75 x 25mm at 600mm centres


    8.00
    hrs/100 lineral metres

    50 x 25mm at 600mm centres on concrete


    0.90
    hrs/m2

    50 x 25mm at 600mm centres on concrete


    33.00
    hrs/100 lineral metres

    Ceiling Linings




    9.5mm Gibraltar Board


    0.15
    hrs/m2

    12mm Pinex Softboard


    0.15
    hrs/m2

    4.75mm, 6mm hardboard


    0.30
    hrs/m2

    4.5mm Asbestos Cement


    0.35
    hrs/m2

    3mm, 4.75mm Pegboard


    0.35
    hrs/m2

    12mm Pinex Panels


    0.35
    hrs/m2

    12mm Pinex accoustic Tiles


    0.50
    hrs/m2

    Ceiling Strappings




    50 x 25mm at 300mm centres


    0.25
    hrs/m2

    50 x 25mm at 300mm centres


    7.00
    hrs/100 lineal metres

    75 x 25mm at 300mm centres


    0.25
    hrs/m2

    75 x 25mm at 300mm centres


    7.00
    hrs/100 lineal metres

    Flooring




    Tongue and Groove




    75 x 25mm


    1.10
    hrs/m2

    75 x 25mm end matched


    0.80
    hrs/m2

    100 x 25mm


    0.90
    hrs/m2

    100 x 25mm end matched


    0.65
    hrs/m2

    Particle Board




    2400 x 1200mm


    0.30
    hrs/m2

    Interior Finishings




  • Skirtings

  • 16.50
    hrs/100 lineal metres
  • Architraves

  • 15.00
    hrs/100 lineal metres
  • Cornice

  • 11.50
    hrs/100 lineal metres
  • Quadrant

  • 10.00
    hrs/100 lineal metres
  • Sill Boards

  • 20.00
    hrs/100 lineal metres

    Windows




  • Small windows up to 1m2

  • 1.50
    hrs/each
  • Medium sized windows

  • 2.50
    hrs/each
  • Large windows over 2m2

  • 4.00
    hrs/each
  • Extra-large windows over 3m2

  • 6.00
    hrs/each
  • Fit D handles

  • 0.25
    hrs/each
  • Fit sash fasteners

  • 0.30
    hrs/each
  • Fit telescopes stays

  • 0.30
    hrs/each

    Doors




  • Single hinged exterior doors

  • 2.00
    hrs/each
  • Door frames to ditto

  • 2.00
    hrs/each
  • Double exterior doors

  • 4.00
    hrs/each
  • Double frames to ditto

  • 2.50
    hrs/each
  • Single hinged interior doors

  • 2.00
    hrs/each
  • Door jamb sets

  • 1.50
    hrs/each
  • Double hinged interior doors

  • 4.00
    hrs/each
  • Door jamb sets

  • 1.00
    hrs/each
  • Single sliding doors

  • 3.50
    hrs/each
  • Door jamb set and pelmet

  • 1.50
    hrs/each
  • Large sliding doors

  • 4.50
    hrs/each
  • Door jamb set and pelmet

  • 2.00
    hrs/each
  • Double sliding wardrobe doors

  • 5.50
    hrs/each
  • Door jamb set to ditto

  • 1.20
    hrs/each
  • Triple sliding wardrobe doors

  • 7.50
    hrs/each
  • Door jamb set to ditto

  • 1.50
    hrs/each
  • Bifold doors and gear

  • 3.50
    hrs/each
  • Door jamb set to ditto

  • 1.00
    hrs/each
  • Double bifold doors and gear

  • 7.00
    hrs/each
  • Door jamb set to ditto

  • 1.50
    hrs/each
  • Metal framed sliding doors

  • 6.00
    hrs/each
  • Rough frame to ditto

  • 2.00
    hrs/each
  • Large metal framed sliding doors

  • 8.00
    hrs/each
  • Rough frames to ditto

  • 2.50
    hrs/each
  • Overhead garage door

  • 6.00
    hrs/each
  • Jamb set to ditto

  • 2.50
    hrs/each
  • Roller shutter garage door

  • 6.00
    hrs/each
  • Fit night latches

  • 1.00
    hrs/each
  • Fit mortice locks

  • 1.00
    hrs/each
  • Fit mortice latches

  • 0.80
    hrs/each
  • Over cupboard doors

  • 1.00
    hrs/each
  • jambs to over cupboards (in pairs)

  • 0.50
    hrs/each
  • Cupboard catch

  • 0.30
    hrs/each
  • Cupboard handle

  • 0.25
    hrs/each

    Cupboard Fittings




  • 1650mm Sink Bench

  • 3.50
    hrs/each
  • Sink Bench top

  • 1.50
    hrs/each
  • 1800mm Dresser Bench

  • 3.50
    hrs/each
  • 1800mm Dresser Over cupboard

  • 3.00
    hrs/each
  • Hot Water Cupboard

  • 3.00
    hrs/each
  • Bathroom Cabinet

  • 1.50
    hrs/each
  • Wash tub Cupboard

  • 2.50
    hrs/each
  • Bathroom Vanity Unit

  • 1.50
    hrs/each
  • Hand Basin Cupboard

  • 2.50
    hrs/each
  • Cupboard Catches

  • 0.30
    hrs/each
  • Cupboard Handles

  • 0.25
    hrs/each

    Sundries




  • Build in bath included panel and trim

  • 6.00
    hrs/100 each
  • Shelving

  • 1.30
    hrs/m2
  • 75 x 25mm Shelf cleats

  • 13.00
    hrs/100 lineal metres

    hrs/100 no


    1.70
    hrs/m2

    hrs/100 no


    13.00
    hrs/100 lineal metres
  • Rubber door stops

  • 1.50
    hrs/each
  • 900mm Towel rail and brackets

  • 0.60
    hrs/each
  • Toilet roll holder

  • 0.30
    hrs/each
  • Soap recess

  • -0.5
    hrs/each
  • Trim for meter box

  • 1.50
    hrs/each
  • Trim for switch board

  • 2.00
    hrs/each
  • Build in flight of stairs

  • 20.00
    hrs/each
  • Fit handrail on brackets

  • 6.00
    hrs/each
  • Fix W.I. balustrade

  • 65.00
    hrs/100 lineal metres
  • Fix hanger rail and cleats

  • 1.00
    hrs/each
  • Hat and coat hooks

  • 0.25
    hrs/each
  • S.S Shower trays

  • 2.50
    hrs/each