Labour Factor Database

Our comprehensive database makes it simple to search for and find the exact labour factors you need. The advanced filtering options let you narrow down your search based on your project needs, helping you plan and schedule your construction projects more effectively.
  • Search

  • Trade Categories

Demolition - Services

For a feasibility study, your Demolition breakdown is 25% labour, 0% material, and 75% fixed costs.

Description
Man Hours
Unit

Disconnection of Plumbing Fittings




Disconnect and remove, including waste, vent, water supply pipework, taps




  • WC pan and cistern, or vanity basin

  • 1.20
    hrs/item
  • Stainless steel sink and drainer

  • 1.00
    hrs/item
  • Shower

  • 2.80
    hrs/item

    Pipework




    Disconnect and remove waste and vent pipework




  • 10mm to 50mm dia copper

  • 0.08
    hrs/m
  • 50mm to 80mm dia galvanised steel

  • 0.10
    hrs/m
  • 80mm to 100mm dia galvanised steel

  • 0.20
    hrs/m
  • 100mm to 150mm dia copper or cast iron

  • 0.35
    hrs/m