For a feasibility study, your Excavation breakdown is 20% labour, 15% material and 65% fixed costs.
Site Clearance
Strip 50mm topsoil and remove from site (machine)
Strip 50mm topsoil and cart to temporary stockpile on site (machine)
Strip 100mm topsoil and cart to temporary stockpile on site (machine)
Strip 150mm topsoil and cart to temporary stockpile on site (machine)
Excavation, Backfilling and Filling
Hand Excavation in trenches not exceeding 1m deep
Hand Loading and Removal
Wheel not exceeding 50m, spread and level
Backfilling and compaction
Machine Excavation and backfilling in trenches not exceeding 1m deep, in medium soil
Add
Basecourse filling in 150mm thick layers under slabs
Planking and Strutting
Planking and strutting to excavation
Surface Treatments
Sand Blinding to filling under slabs
Level and Grade Surface
Membranes
Underlay, plastic film