FREE RESOURCES

Labour Factor Database

Our comprehensive database makes it simple to search for and find the exact labour factors you need. The advanced filtering options let you narrow down your search based on your project needs, helping you plan and schedule your construction projects more effectively.
  • Search

  • Trade Categories

Glazing

For a feasibility study, your Glazing breakdown is 25% labour, 75% materials and 0% fixed costs.

Description
Man Hours
Unit

Glazing in regular panes up to 1m x 1m




  • Timber frames with putty

  • 0.90
    hrs/m2
  • Timber frames with beads

  • 1.00
    hrs/m2
  • Metal frames, with putty/mastic and/or neoprene strips

  • 1.20
    hrs/m2
    linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram