For a feasibility study, your Demolition breakdown is 25% labour, 0% material, and 75% fixed costs.
Disconnection of Plumbing Fittings
Disconnect and remove, including waste, vent, water supply pipework, taps
Pipework
Disconnect and remove waste and vent pipework